by pacificmarkconstruction-com | Oct 21, 2021 | General
The restoration of the century-old North Turnaround Signal Communication Building was part of the greater Portland mall project. Pacificmark carefully restored re-build many of the original details, and strengthened the brick exterior. During the work we discovered...
by pacificmarkconstruction-com | Oct 21, 2021 | General
This ongoing project includes the demolition of five townhomes involving three separate buildings and the modification of current condo units to make way for the new and improved Sellwood...
by pacificmarkconstruction-com | Oct 21, 2021 | General
The beautiful new 36,000 Sq Ft Student Union Building at PCC Cascade Campus sits atop a parking garage to best utilize campus space. This LEED Gold building is three stories high and interior work consisted of metal framed walls, stairways, drywall finishing and much...
by pacificmarkconstruction-com | Oct 21, 2021 | Building
This project was a sizable renovation of the 1,680 SF Kiln Yard at Portland Community College’s Sylvania Campus. Improvements consisted of the demolition of existing structures, concrete paving, storm water planter furnishing, fence installation,...
by pacificmarkconstruction-com | Oct 20, 2021 | Building
The Justice Center’s 11th floor underwent a much needed face-lift as it serves as the busy work environment for the police department. The copy room was updated to allow for new equipment to move in and the mail area was improved. Additional offices were added, the...