The Justice Center’s 11th floor underwent a much needed face-lift as it serves as the busy work environment for the police department. The copy room was updated to allow for new equipment to move in and the mail area was improved. Additional offices were added, the breakroom was renovated and new cabinetry was installed. The Police Captain’s office space doubled in size and a special changing area was added. This entire floor was installed with new data and alarm wiring.

On the 12th floor Pacificmark remodeled the previous photo lab by modernizing it into a state-of-the-art digital forensics space designed by the occupying lab technicians themselves. This work consisted of interior demolition, new walls, new ACT ceiling frames/tiles, floor leveling, new carpet and upgrades to the electrical and HVAC systems. Nearby holding cells were also renovated and given a two-part epoxy to eliminate occupants from vandalism.